Fixture Spacing and Electrical Distribution: A Buyer’s Framework
Fixture spacing and electrical distribution are two separate calculations that are often confused. Spacing is an optical decision driven by what each lighting position must achieve. Distribution is an electrical decision driven by input power, load behaviour and circuit design. Getting both right starts with defining the job of each position before any distance or breaker is chosen.
Spacing Starts From Purpose, Not From a Grid
Front light exists to make the acting area readable and to model faces. It needs cross-coverage: fixtures from opposite sides of the auditorium should overlap so that a performer moving across the stage never leaves a front-lit pool. Backlight and effects follow the intended look rather than a coverage rule. Side light depends on the entry angle: a steep side angle gives strong modelling, a shallow one wraps more softly. Define what each position solves first, then set spacing.
- Front light: cross-coverage across the acting area; check overlap at the edges of the stage, not just centre.
- Backlight: follows the visual design; spacing set by the desired separation of pools and haze effect.
- Side light: entry angle drives spacing; steeper angles need closer spacing for even coverage.
- Effects: spacing set by the effect itself, not by general coverage rules.
Check: ask the supplier for photometric data and a beam/field angle definition so you can compare fixtures on the same basis.
Beam Angle Versus Distance: Spacing Follows Edge Overlap
A wider beam covers more area at lower illuminance for the same fixture output. Spacing therefore follows the edge overlap of adjacent pools: if two fixtures are spaced so their pools just touch, the midpoint between them is dimmer than the centres. Overlapping the edges by a defined margin produces even coverage. The relationship is geometric — pool diameter grows with distance and beam angle — so spacing must be recalculated whenever trim height or beam angle changes.
Check: request the beam angle and field angle from the datasheet, and confirm the illuminance at the actual throw distance rather than at a reference distance. Do not assume a quoted figure applies at your trim height.
Distribution Is Not a Simple Sum
Adding every fixture’s rated power overstates demand. Size from input power with a realistic simultaneity factor, account for dimmed or derated operation, and allow for inrush. Rated power on a datasheet is usually a maximum; dimmed operation draws less, and not every fixture runs at full at once. Inrush — the brief current spike at switch-on — matters for breaker selection, especially with LED and discharge sources.
| Factor | What it changes | Document to request |
|---|---|---|
| Input power per fixture | Baseline load | Datasheet, input power section |
| Simultaneity factor | Realistic demand | Your own show plot; supplier guidance on derating |
| Dimmed/derated operation | Reduced draw | Dimming curve or derating table |
| Inrush current | Breaker and circuit choice | Test report or inrush specification |
Check: confirm whether the input power figure includes driver losses and whether inrush is specified per fixture or per circuit.
How to Split Circuits
Split circuits by lighting position so a fault affects one position, not the whole rig. Balance phases across the distribution board to keep neutral current and voltage drop manageable. Put large fixtures on dedicated circuits so one trip does not black out a whole position. Number every circuit at the board and at the outlet, and keep the numbering consistent with the patch sheet.
Check: ask for a circuit schedule template and confirm the breaker type and rating against the inrush data.
Cable, Voltage Drop and Route Planning
Long runs need a check on conductor size and voltage drop; a cable that is adequate at the board may be marginal at the far end of a truss. Temporary events need cable ramps and a route plan that keeps cables out of walkways and away from heat. Voltage drop depends on current, conductor size and run length — calculate it for the longest run, not the average.
Check: request cable specifications and confirm the drop calculation method with your electrical contractor.
Site Checklist and Common Mistakes
- Fixture type and count per position.
- Input power per fixture, from the datasheet.
- Circuit numbering and rating, matched to the patch sheet.
- Total capacity and spare ratio — leave headroom for additions.
- Earthing and RCD protection confirmed for the venue.
Common mistakes: sizing from optical output instead of input power; ignoring inrush when choosing breakers; and confusing console channel count with circuit count — a console channel is a control address, not a power circuit.
FAQ: How do I know if my spacing is even enough?
Check edge overlap at the actual trim height using photometric data, and confirm the illuminance at the midpoint between fixtures, not just at the centres.
FAQ: Can I size distribution from the sum of rated power?
No. Use input power with a simultaneity factor, derated operation and an inrush allowance, and confirm each figure against the supplier’s datasheet or test report.